Free guide · 18 pages
The Chicago Bathroom Renovation Guide
Costs, permits, waterproofing, selections and the questions to ask, from the crew that does the work. For guest baths, full renovations and master suites.
- Which project is yours, and what it costs
- When a Chicago bathroom needs a permit
- What makes a bathroom last, behind the tile
- A 5-page workbook you can type into, or print
Everything in the Order It Happens
Read pages 3–12 once, then fill in the workbook as you go: type right into the PDF, or print it.

Page 1 of 18

Page 3 of 18

Page 4 of 18

Page 7 of 18

Page 8 of 18

Page 15 of 18
- 03The roadmapSix steps from old bath to new.
- 04Which project is yours, and what it costsGuest bath refresh, full renovation or luxury master suite.
- 05Your budget and how you payPlan each line, plus a 10–15% contingency.
- 06Permits and approvalsNo permit, Express Permit or standard plan review.
- 07Design decisions that matterTub or shower, curbless entry, vanity, lighting and the fan.
- 08What makes a bathroom lastWaterproofing, the flood test, slope and the right backer board.
- 09Selections and lead timesWhat to decide, and when, so you build once.
- 10Hiring a contractor8 questions for every bidder, and the red flags.
- 11Living through it + final walkthroughWhat to expect, and a 12-point sign-off.
- 12GlossaryBathroom words in plain English.
- 13Your workbookFive fillable pages: brief, selections tracker, bid comparison, change log, contacts. Type in the PDF or print.
Is Your Bathroom Ready to Start?
Six questions, one minute. Answer honestly: nobody’s watching.
1.Do you know if you’re keeping the layout or moving plumbing?
2.Have you picked your shower valve, tub and vanity?
3.Do you know if your bathroom needs a permit?
4.Has your contractor told you which waterproofing they use, and if they flood test?
5.Is there a 10–15% contingency in your budget?
6.If it’s your only bathroom, do you have a plan for the weeks it’s down?
Your score
0 / 6
Answer the six questions to see how ready you are.
Bathroom Renovation: Myth or Fact?
Six things owners often believe. Tap a card to see what really happens.
How Long Each Step Takes
Written bid, after the walkthrough
1–2 weeks
Design and selections
1–3 weeks
Permit review
2–4 weeks
Construction
3–6 weeks
Construction typically takes 3–6 weeks, and permit review adds 2–4 weeks before that. Long-lead items like the vanity, tile and tub are ordered before demolition, so the crew never waits on a delivery.
What a Bathroom Costs in Chicago
Typically, in Chicago
$8,000–$20,000
A refresh: new vanity, toilet, tile floor and fixtures. Best for a secondary bath that works but looks dated.
Moving the toilet, shower or walls pushes the price up; keeping the layout keeps it down. More on our bathroom renovation page.
Free guide · 18 pages
Get the parts you never see right
Costs, permits, waterproofing and the questions to ask, plus a 5-page workbook you can type into. Free, by email.
Planning a bathroom?
Get a Bathroom Bid You Can Actually Read
We renovate bathrooms across Chicago and the North Shore, from guest bath refreshes to luxury master suites, with tile set by our own crews.