Free guide · 20 pages
The Chicago Condo Renovation Guide
Your association, City permits, budget, timeline and the questions to ask, from the crew that does the work. For kitchens, bathrooms and full units.
- What to get from your property manager first
- Which Chicago permit path your project needs
- Costs, timelines and what to decide when
- A 6-page workbook you can type into, or print
Everything in the Order It Happens
Read pages 3–13 once, then fill in the workbook as you go: type right into the PDF, or print it and bring it to your first meeting with your building.

Page 1 of 20

Page 3 of 20

Page 5 of 20

Page 7 of 20

Page 10 of 20

Page 16 of 20
- 03The roadmapSeven steps from idea to keys back in your hand.
- 04How long it really takesTime on site for paint, a bath, a kitchen or a full gut.
- 05Your building comes firstNine things to get from your property manager.
- 06Permits in ChicagoNo permit, Express Permit or standard plan review.
- 07What it costsRanges for baths, kitchens and whole condos.
- 08Budget worksheet and paymentPlan each line, plus a 10–15% contingency.
- 09Selections and lead timesWhat to decide, and when, so you build once.
- 10What’s behind the wallsConcrete ceilings, risers, fan coils and more.
- 11Hiring a contractor8 questions for every bidder, and the red flags.
- 12Living through it + final walkthroughA temporary kitchen, shutoffs, and a 12-point sign-off.
- 13GlossaryRenovation words in plain English.
- 14Your workbookSix fillable pages: brief, building rules, bid comparison, selections, change log, contacts. Type in the PDF or print.
Is Your Condo Project Board-Ready?
Six questions, one minute. Answer honestly: nobody’s watching.
1.Do you have your building’s renovation (alteration) packet?
2.Do you know your building’s allowed work hours?
3.Do you know where the plumbing risers run in your unit?
4.Do you know if new hard flooring needs a sound-rated underlayment?
5.Does your contractor’s insurance certificate name the association and management company?
6.Do you know how to reserve the freight elevator?
Your score
0 / 6
Answer the six questions to see how ready you are.
Condo Renovation: Myth or Fact?
Six things owners often believe. Tap a card to see what really happens.
How Long Each Step Takes
Association review
4–8 weeks
City permit, if needed
4–10 weeks
Bathroom, on site
3–6 weeks
Kitchen, on site
6–12 weeks
A full condo gut renovation typically takes 5–9 months from approvals to punch list. Pick finishes and order long-lead items while the association and the city review, so they’re ready when work starts.
What Condo Work Costs in Chicago
Typically, in Chicago
$20,000–$55,000
A complete gut and rebuild with waterproofing, a custom tile shower, a new vanity and new fixtures.
What moves the price is in our guide to condo renovation in Chicago.
Free guide · 20 pages
Get your building on your side first
Permits, costs, timeline and the questions to ask, plus a 6-page workbook you can type into. Free, by email.
Planning a condo project?
Get a Bid Your Board Can Approve
We renovate condos in Chicago high-rises and vintage buildings, and we prepare the paperwork your association asks for.