Free guide · 18 pages
The Chicago Home Addition Guide
Costs, zoning, design, permits and the questions to ask, from the crew that does the work. For room additions, rear additions and second stories.
- Which addition is yours, and what it costs
- Zoning, then drawings, then the permit
- What makes an addition last, at the tie-in
- A 5-page workbook you can type into, or print
Everything in the Order It Happens
Read pages 3–12 once, then fill in the workbook as you go: type right into the PDF, or print it.

Page 1 of 18

Page 3 of 18

Page 4 of 18

Page 6 of 18

Page 8 of 18

Page 15 of 18
- 03The roadmapSix steps from idea to move-in.
- 04Which addition is yours, and what it costsRoom addition, rear addition or second story.
- 05Your budget and how you payPlan each line, plus a 10–15% contingency.
- 06Zoning, drawings and permitsSetbacks and FAR, the architect and engineer, then plan review.
- 07Design decisions that matterUp or out, matching the house, floor heights, windows and capacity.
- 08What makes an addition lastThe engineer’s design, the foundation and a weathertight tie-in.
- 09Selections and lead timesWhat to decide, and when, so you build once.
- 10Hiring a contractor8 questions for every bidder, and the red flags.
- 11Living through it + final walkthroughThe tie-in, neighbors, and a 12-point sign-off.
- 12GlossaryAddition words in plain English.
- 13Your workbookFive fillable pages: brief, selections tracker, bid comparison, change log, contacts. Type in the PDF or print.
Is Your Addition Ready to Start?
Six questions, one minute. Answer honestly: nobody’s watching.
1.Has anyone checked the zoning for your lot?
2.Do you know if you’re building up or out?
3.Do you have an architect, or know who will draw it?
4.Have you planned for 12–24 months, start to finish?
5.Do you know if your heating, electrical and plumbing can carry more space?
6.Is there a 10–15% contingency in your budget?
Your score
0 / 6
Answer the six questions to see how ready you are.
Home Additions: Myth or Fact?
Six things owners often believe. Tap a card to see what really happens.
How Long Each Step Takes
Design and engineering
2–4 months
Permit review
3–6 months
Construction
4–8 months
Start to finish
12–24 months
Most of the calendar is design and permits, not construction. Long-lead materials are ordered during permit review.
What an Addition Costs in Chicago
Typically, in Chicago
$150,000–$300,000
A single room or master suite of 400–800 SF: new foundation or cantilever, framing, all trades and full finishes.
Budget about $300–$600 per square foot for a quality Chicago addition. More in our home addition cost guide.
Free guide · 18 pages
The biggest project starts on paper.
Costs, zoning, design, permits and the questions to ask, plus a 5-page workbook you can type into. Free, by email.
Planning an addition?
Get an Addition Bid You Can Actually Read
We build room additions, rear additions and second stories across Chicago and nearby suburbs, designed to blend into the existing house, with framing and carpentry by our own crews.