The Chicago Home Renovation Guide
Costs, permits, structure, old-house surprises and the questions to ask, from the crew that does the work. For greystones, two-flats and frame homes.
- Which project is yours, and what it costs
- Gut or phase: when you can stay in the house
- What makes a renovation last, behind the walls
- A 5-page workbook you can type into, or print
Everything in the Order It Happens
Read pages 3–12 once, then fill in the workbook as you go: type right into the PDF, or print it.

Page 1 of 18

Page 3 of 18

Page 4 of 18

Page 7 of 18

Page 8 of 18

Page 15 of 18
- 03The roadmapSix steps from walkthrough to warranty.
- 04Which project is yours, and what it costsTargeted renovation, major renovation or full gut rehab.
- 05Your budget and how you payPlan each line, plus a 10–15% contingency.
- 06Permits and approvalsCosmetic work, systems and structure, additions, and landmark review.
- 07Design decisions that matterExisting conditions, layout, what to keep, and gut or phase.
- 08What makes a renovation lastStructure before finishes, all-new systems, insulation, matched trim.
- 09Selections and lead timesWhat to decide, and when, so you build once.
- 10Hiring a contractor8 questions for every bidder, and the red flags.
- 11Living through it + final walkthroughMove out or stay, weekly meetings, and a 12-point sign-off.
- 12GlossaryRenovation words in plain English.
- 13Your workbookFive fillable pages: brief, selections tracker, bid comparison, change log, contacts. Type in the PDF or print.
Is Your Renovation Ready to Start?
Six questions, one minute. Answer honestly: nobody’s watching.
1.Do you know what shape the structure and systems are in?
2.Do you know if you’ll gut the house or phase the work?
3.Have you decided which original details to keep?
4.Do you know which parts of the work need a permit?
5.Do you know if your home is a Chicago Landmark?
6.Is there a 10–15% contingency in your budget?
Your score
0 / 6
Answer the six questions to see how ready you are.
Home Renovation: Myth or Fact?
Six things owners often believe. Tap a card to see what really happens.
How Long Each Step Takes
Permit review
2–8 weeks
Bathroom
3–6 weeks
Kitchen
6–12 weeks
A full gut rehab takes 3–6 months after permits, and additions take 4–8 months. Permit review comes before construction starts.
What a Renovation Costs in Chicago
Typically, in Chicago
$75,000–$200,000
A kitchen or bathroom gut renovation, basement finishing, or a focused multi-room refresh. Best for fixing the rooms that matter most.
About $150–$350 per square foot for a typical whole-house renovation. More in our gut rehab cost guide.
Free guide · 18 pages
Old houses hide things. Plan for it.
Costs, permits, structure, old-house surprises and the questions to ask, plus a 5-page workbook you can type into. Free, by email.