The Chicago Multifamily Renovation Guide

Per-unit costs, phasing around leases, permits and the questions to ask, from the crew that does the work. For value-add refreshes, unit renovations and gut rehabs.

  • Which scope fits, and what it costs per unit
  • Phasing the work around your leases
  • Occupied buildings and lease-ready turnover
  • A 5-page workbook you can type into, or print

Get the free guide

18-page fillable PDF. We'll email it to you.

We'll also send you Project Tips & Field Notes, our newsletter. Unsubscribe anytime.

Look inside

Everything in the Order It Happens

Read pages 3–12 once, then fill in the workbook as you go: type right into the PDF, or print it.

  • Cover of The 32 Build Guide to Renovating a Chicago Apartment Building

    Page 1 of 18

  • Guide page 3: the six-step roadmap from building walk to lease-ready

    Page 3 of 18

  • Guide page 4: value-add, mid-range and gut rehab costs per unit in Chicago

    Page 4 of 18

  • Guide page 7: six planning decisions for a multifamily renovation

    Page 7 of 18

  • Guide page 9: one standard finish package and its lead times

    Page 9 of 18

  • Guide page 11: occupied buildings and the lease-ready unit checklist

    Page 11 of 18

  1. 03The roadmapSix steps from building walk to lease-ready.
  2. 04Which scope fits, and what it costs per unitValue-add refresh, mid-range renovation or full gut rehab.
  3. 05Your budget and how you payPlan each line, including vacancy and lost rent, plus a contingency.
  4. 06Permits and inspectionsCosmetic refresh, layout and system work, and gut rehabs.
  5. 07Planning decisions that matterWhich units, phasing around leases, one finish package, occupied or vacant.
  6. 08What makes a unit lastDurable kitchens, waterproofed baths and flooring for turnover.
  7. 09Finish package and lead timesPick one package, repeat it, and order a whole phase at once.
  8. 10Hiring a contractor8 questions for every bidder, and the red flags.
  9. 11Occupied buildings + lease-ready turnoverResident notices, dust and work hours, and a 12-point unit checklist.
  10. 12GlossaryMultifamily words in plain English.
  11. 13Your workbookFive fillable pages: brief, finish package tracker, bid comparison, unit schedule, contacts.
Quick quiz

Is Your Building Ready to Start?

Six questions, one minute. Answer honestly: nobody’s watching.

  1. 1.Do you know which units need which scope?

  2. 2.Have you mapped out when each lease ends?

  3. 3.Have you picked one standard finish package?

  4. 4.If units are occupied, do you have a plan for residents?

  5. 5.Have you decided if common areas are part of this project?

  6. 6.Does your budget include vacancy and lost rent?

Your score

0 / 6

Answer the six questions to see how ready you are.

Multifamily Renovation: Myth or Fact?

Six things owners often believe. Tap a card to see what really happens.

Timeline

How Long Each Step Takes

  • Written per-unit bid, after the walk

    1–2 weeks

  • Value-add refresh, per unit

    1–2 weeks

Larger phased buildings take several months, phased around lease expirations and vacancies. Rough-in is inspected before the walls close, unit by unit.

Costs

What It Costs per Unit in Chicago

Typically, in Chicago

$15,000–$35,000 / unit

Paint, flooring, fixture and appliance replacement, cabinet refacing. The most rent premium per dollar.

Common areas, envelope work and building mechanicals are priced separately. Planning a unit turn? See our unit turn checklist.

Free guide · 18 pages

Every vacant week costs you rent.

Per-unit costs, phasing around leases, permits and the questions to ask, plus a 5-page workbook with a unit schedule. Free, by email.

Get the free guide

18-page fillable PDF. We'll email it to you.

We'll also send you Project Tips & Field Notes, our newsletter. Unsubscribe anytime.

Planning a building?

Get a Per-Unit Bid You Can Actually Read

We renovate Chicago two-flats, three-flats and apartment buildings, from value-add refreshes to full gut rehabs, with more than 2,000 units renovated.

Get a BidMultifamily renovation

We respond the same day