The Challenge
What We Were Up Against
The building dates to 1914, and the floor carried more than a century of earlier work, including many pre-existing connections for plumbing, electrical, and mechanical systems running through the walls and ceilings we were taking out.
Each existing connection had to be found and traced, then kept, rerouted, or properly capped before demolition could finish and the new layout could be framed.