The Challenge
What We Were Up Against
The existing layout put the vanity, tub, and shower in a configuration that made the room feel cramped even though the square footage was adequate. The renovation required a full floor-plan rethink — moving plumbing to place the steam shower and tub where the space could actually open up.
Gold Coast condos also add their own logistics: building management work windows, freight elevator reservations, and HOA documentation all have to be planned before a single tool goes in.





