The Challenge
What We Were Up Against
The house was built in 1908 and hadn't had significant work in decades. Raising the basement ceiling height required underpinning. The rear addition needed new footings.
Once demo opened the walls, the original balloon-frame structure needed evaluation and reinforcement before the new layout could take shape. The scope grew after demolition — it always does in buildings like this — and the schedule had to adapt without losing the timeline.





