Metal studs are the norm in commercial interiors; wood is the standard for walls that carry weight. Here is how the choice is made, what each is good at, and what to plan for with either.
Every framing scope starts with the same question: steel or lumber? In practice, the drawings and the building usually decide, but knowing why helps owners, tenants, and GCs read a scope and a bid.
The short answer
- Metal studs are the norm for non-load-bearing interior partitions in offices, retail, restaurants, medical suites, and apartment buildings.
- Wood is the standard for walls that carry weight, exterior walls, additions and new homes, and most interior walls in houses.
Why commercial buildings use metal studs
Light-gauge steel studs come straight and stay straight, they don’t rot or shrink, and they are noncombustible, which many commercial buildings and codes require. That is why interior walls in most Chicago office, retail, and medical buildings are framed in metal.
Metal framing is built to the wall types on the drawings: stud gauge and spacing, track at the floor and the deck above, and deflection track at the top so the floor above can move without cracking the wall. Fire-rated and sound-rated partitions are built exactly to the assemblies on the drawings, because they are inspected and hard to fix once the board is up. More on our metal stud framing work.
Why homes and structural work use wood
Dimensional lumber holds fasteners well and is easy to adjust in the field, which matters most in Chicago’s older buildings, where very little is still square. Wood is the usual choice for load-bearing walls, exterior walls, headers and new openings, additions, and new construction. In greystones, two-flats, and frame houses, new walls are often sistered or shimmed to line up with old framing. More on our wood framing work.
Side by side
- Load-bearing walls: wood, sized to the engineer’s drawings.
- Office and tenant partitions: metal studs, built to the wall types.
- Demising and corridor walls: metal studs, often rated and full height to the deck.
- Exterior walls and additions: wood, with sheathing, to the engineered drawings.
- Basements: either; metal is sometimes chosen where moisture is a concern.
- Ceilings, soffits, and bulkheads in commercial space: metal framing around ducts, sprinklers, and lighting.
Blocking: the detail both need
A steel stud on its own won’t hold a heavy load, and even a wood stud is rarely where a cabinet or grab bar needs to go. Wood or metal blocking is installed before the walls close wherever casework, millwork, TVs, equipment, or grab bars will hang. It costs very little while the walls are open; adding it later means cutting into finished drywall.
What framing costs
Framing is usually priced by scope rather than by stud type. As a guide, a partition and blocking scope for a single room or floor runs about $1,500–$6,000; a full framing package for a single-unit renovation, $6,000–$20,000; and rough framing for an addition or new construction, $20,000 and up. Rated walls, tall walls that need heavier studs, and structural changes add to the number.
Permits
Structural framing, such as wall removal, additions, and new construction, requires a Chicago Department of Buildings permit. Non-structural partitions within an already-permitted buildout or renovation are usually covered by the main permit. See also the glossary entry on metal stud framing and our framing and rough carpentry page.
About Field Notes
Field Notes is published by 32 Build, a licensed, bonded & insured Chicago general contractor working in residential renovation, gut rehabs, multifamily repositioning, and commercial construction. Every article is written or reviewed by our field team based on actual project experience — not national averages or general advice.